Clarification of whether it is possible to run the test and production connections simultaneously with the General Authority of Zakat and Tax and Customs for Phase Two.
Answer:
- The test and production connections cannot be run simultaneously.
- The test connection is used to test the system and verify its operation before official activation with the authority.
- When switching to the production connection, the test connection is automatically disabled.
Additional Notes:
- When transitioning to the production connection, you must verify the accuracy of your data and settings.